The valve well and Culvert will enable the Valves and Syphon Forward to be always within reach for examination and repairs.

I propose to construct the Rye Wash as shown on the Stan × 5' and calculate that it will discharge 11,016,000 Cft of Water per hour or nearly 6 in: per hour rain fall on the Gathering Ground.

It would appear to be impossible that such a rain fall, 6 in: per hour could ever fall, there has however been a fall of 2.6′′.

The Existing Malis Weir which is 120 feet wide and may be of 400 Square feet in place of 300 Square feet which has actually been found to be required. Culvert under the Rye Wash is provided for in case of emergency, and the sluice Valves in the Valve Well will discharge a further 2,091,600 Cft per hour.

During the Construction of the Embankment a Temporary Bye Wash must be formed to carry off flood Waters, and the nature of the Ground will necessitate its being placed where the permanent Rye Wash will be formed but of course at a lower level, probably 15 feet above the bed of the Reservoir, the level at which it is proposed to construct the Tail Culvert. I should hope to be able to complete the Embankment to this height before the rains set in.

Page 180

Page 181

Edit History

2026-05-19 11:38:22 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
The valve well and Culvert will enable the Valves and Syphon Forward to be always within reach for examination and repairs. I propose to construct the Rye Wash as shown on the Stan × 5' and calculate that it will discharge 11,016,000 Cft of Water per hour or nearly 6 in: per hour rain fall on the Gathering Ground. It would appear to be impossible that such a rain fall, 6 in: per hour could ever fall, there has however been a fall of 2.6′′. The Existing Malis Weir which is 120 feet wide and may be of 400 Square feet in place of 300 Square feet which has actually been found to be required. Culvert under the Rye Wash is provided for in case of emergency, and the sluice Valves in the Valve Well will discharge a further 2,091,600 Cft per hour. During the Construction of the Embankment a Temporary Bye Wash must be formed to carry off flood Waters, and the nature of the Ground will necessitate its being placed where the permanent Rye Wash will be formed but of course at a lower level, probably 15 feet above the bed of the Reservoir, the level at which it is proposed to construct the Tail Culvert. I should hope to be able to complete the Embankment to this height before the rains set in. Page 180 Page 181
Baseline (Original)
The valve well and Culvert will enable the Valves and Syphon Forward- to be always within reach for examination and repairs. 80 fr I propose to construct the Rye Wash as shown on the Stan × 5' and calculate that it will discharge 11,016,000 Cf of Water per hour rain fall on the Gathering Ground of or ap -nearly 6 in : per hour. 0xx It would appear to be impressible that such a rain fall, 6 inv: per hour could ever fall, there has however been a defothe of 2.6′′ GENEL simply give the Ex a. Existing Malis Weir which is 120 feet wide and I: may of 400 Square feet in place of 300 cede al Squan feet which has actually been found to be required, Culvet under the Poze Wash is provided for in case of this with the sluice Values in the Valve Well will emergency discharge a further 2.091. 600 Cft per hour. Werring the Construction of the Embantiment a Temporary Bye Mash must be formed to carry off flood Matirs, and the nature of the Ground will necessitate its being placid where the permanent Dye Wash will be formed but of course at a lower level probably 15 feet above the bed of the Reservoir the level at which it is proposed to construct the Taste Culvert I should hope to be able to complete the Embantiment to this height before the pains set in. ی میں A. ext 2000 179 96281 80 Tornaed 2000 #9628180 Page 180Page 181
2026-05-19 11:38:22 · Baseline
View content

The valve well and Culvert will enable the Valves and Syphon Forward- to be always within reach for examination and repairs.

80 fr

I propose to construct the Rye Wash as shown on the Stan × 5' and calculate that it will discharge 11,016,000 Cf of Water per hour

rain fall on the Gathering Ground of

or ap

-nearly 6 in : per hour.

0xx

It would appear to be impressible that such a rain fall, 6 inv: per hour could ever fall, there has however been a defothe

of 2.6′′

GENEL

simply give

the Ex

a.

Existing

Malis

Weir which is 120 feet wide and I:

may of 400 Square feet in place of 300

cede

al

Squan feet which has actually been found to be required, Culvet under the Poze Wash is provided for in case of this with the sluice Values in the Valve Well will emergency discharge a further 2.091. 600 Cft per hour.

Werring the Construction of the Embantiment a Temporary Bye Mash must be formed to carry off flood Matirs, and the nature of the Ground will necessitate its being placid where the permanent Dye Wash will be formed but of course at a lower level probably 15 feet above the bed of the Reservoir the level at which it is proposed to construct the Taste Culvert I should hope to be able to complete the Embantiment to this height before the pains set in.

ی میں

A.

ext

2000

179

96281 80

Tornaed

2000

#9628180

Page 180Page 181

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.